A structured preventive maintenance schedule for shale shaker equipment extends service life, maintains separation performance, and prevents unexpected downtime. Aipu Solids Control provides comprehensive preventive maintenance programs based on extensive field experience and equipment engineering analysis.


Daily Preventive Maintenance Tasks
The Aipu daily maintenance schedule includes visual screen inspection for tears, holes, and excessive wear with immediate replacement of damaged screens using the quick-change system. Belt tension verification and adjustment where applicable. Electrical connection inspection for tightness and overheating indicators. Safety interlock testing to verify proper function of all safety devices. Motor temperature monitoring with documentation of normal operating temperatures for trend analysis. These daily tasks prevent minor issues from developing into major failures requiring extended downtime.
Weekly and Monthly Maintenance Requirements
Weekly maintenance includes thorough screen frame cleaning to remove accumulated solids causing imbalance, vibration isolation mount inspection for cracking or uneven compression, motor mounting bolt torque verification to prevent loosening from vibration, and complete operational check of all functions under normal operating conditions. Monthly maintenance adds motor bearing lubrication according to Aipu specifications using recommended grease types, structural weld inspection focusing on motor mount and isolation areas, and comprehensive electrical system testing including insulation resistance measurement.
Scheduled Component Replacement Intervals
Based on engineering analysis of component service life, Aipu recommends scheduled replacement intervals for critical components. Vibrating motor bearings at specified operating hours, isolation springs or mounts at periodic intervals, screen deck wear strips when thickness reaches minimum specification, and electrical components including contactors and overload relays at conservative replacement intervals. Scheduled replacement prevents in-service failures while avoiding unnecessary replacement of serviceable components.
Preventive Maintenance Documentation
Aipu provides comprehensive maintenance documentation including task checklists for each maintenance interval, required tools and materials lists, step-by-step procedures with safety precautions, and maintenance record forms for documentation of completed work. Digital maintenance logs available through the Aipu online support portal enable systematic maintenance tracking and trend analysis. The API Q1 certified manufacturing documentation provides essential reference information for preventive maintenance planning.
Partner with Aipu for certified quality. Contact us at info@aipusolidcontrol.com to discuss your requirements and discover the Aipu difference in API Q1 certified solids control equipment.
If you are interested in our solid control equipment and systems, you can contact us through info@aipusolidcontrol.com Contact Us