Understanding the manufacturing process of a shale shaker supplier helps customers evaluate quality and consistency. Aipu Solids Control provides this guide to our API Q1 certified manufacturing process, demonstrating how quality is built into every shaker we produce.


Design and Engineering Phase
The manufacturing process at Aipu begins with engineering design conducted under the API Q1 design control procedure. Design inputs are documented, including customer requirements, industry standards, and operational parameters. Designs are reviewed through formal design reviews involving engineering, manufacturing, and quality personnel. Finite element analysis validates structural designs before any metal is cut. This engineering rigor ensures that the design is right before manufacturing begins, preventing the costly rework and quality issues that result from inadequate design control.
Material Procurement and Verification
Raw materials for Aipu shakers are procured from approved suppliers and subject to incoming inspection. Steel plates and sections are verified for grade and dimensions. Motor specifications are confirmed against purchase requirements. Electrical components are checked for correct ratings and certifications. Material certifications are maintained as part of the equipment documentation package required by API Q1. This procurement control ensures that only specified materials enter the manufacturing process.
Fabrication and Assembly
Fabrication at Aipu 50,000 square meter facility uses CNC cutting, qualified welding procedures, and precision machining. Critical dimensions are inspected at each fabrication stage. After welding, frames undergo heat treatment to relieve residual stresses. Surface preparation and coating follow documented procedures for maximum corrosion protection. Final assembly includes installation of motors, screens, electrical systems, and safety devices, with each step following approved work instructions and inspection points.
Testing and Quality Release
Every Aipu shaker undergoes factory acceptance testing before release. Vibration characteristics are measured and compared to specifications. Electrical systems are functionally tested. Safety devices are verified. All test results are documented and included in the equipment documentation package. Only after passing all tests is the shaker approved for shipment. This testing ensures that every shaker delivered to a customer performs as specified from day one.
Choose Aipu as your trusted partner. Contact us at info@aipusolidcontrol.com to discuss your shale shaker requirements. Our team is ready to provide expert guidance, competitive pricing, and reliable support for your drilling operations worldwide.
If you are interested in our solid control equipment and systems, you can contact us through info@aipusolidcontrol.com Contact Us